Bad welds holding back at least 3 new boats |
Post Reply | Page 12> |
Author | ||
Guests
Guest Group |
Post Options
Thanks(0)
Posted: 29 Mar 2016 at 7:03pm |
|
Grrrrrr.......he should have been keel-hauled.
|
||
Dr. Stan
Rickover Joined: 04 Jan 2016 Location: Sevierville, TN Status: Offline Points: 7455 |
Post Options
Thanks(0)
|
|
It appears that there may be something missing in the above quote. In the interests of security, etc., we are talking at each other and trying to make points that probably can't be made without mentioning that which we should not mention. I think . . .? |
||
It has been my experience that folks who have no vices have very few virtues.~Abe Lincoln
SS-393, SSBN-610(B), SSBN-624(G), SSN-591 USSVI Life Member; Holland Club; Plank Owner, Smoky Mtn. Base |
||
Sewer Pipe Snipe
BBS Supporter Joined: 04 Jan 2016 Location: Albany, GA Status: Offline Points: 5723 |
Post Options
Thanks(0)
|
|
Seeing as how every weld on a trap manifold was radiographed, and any flange weld was radiographed, plus the 3" carbon steel coupon was radiographed when I had to requalify, I naturally thought I was referring to Main Steam Pipe. There was always a repair package requiring many inspections to be signed off on a field weld. I can even remember slump cones to monitor interpass on larger piping. I made the mistake of figuring it was a part of Sub Safe, as the same procedureal guides were used on seawater piping. Better known as weld procedures.
|
||
Walt,
Had I done everything right throughout my life, the World wouldn't have noticed. |
||
SaltiDawg
Rickover Joined: 03 Jan 2016 Location: Rockville, MD Status: Offline Points: 2865 |
Post Options
Thanks(0)
|
|
The question was:
MS = Main Steam Edited by SaltiDawg - 28 Mar 2016 at 5:26pm |
||
SaltiDawg
Rickover Joined: 03 Jan 2016 Location: Rockville, MD Status: Offline Points: 2865 |
Post Options
Thanks(0)
|
|
Dr. Stan
Rickover Joined: 04 Jan 2016 Location: Sevierville, TN Status: Offline Points: 7455 |
Post Options
Thanks(0)
|
|
GOOD! |
||
It has been my experience that folks who have no vices have very few virtues.~Abe Lincoln
SS-393, SSBN-610(B), SSBN-624(G), SSN-591 USSVI Life Member; Holland Club; Plank Owner, Smoky Mtn. Base |
||
SaltiDawg
Rickover Joined: 03 Jan 2016 Location: Rockville, MD Status: Offline Points: 2865 |
Post Options
Thanks(0)
|
|
QA gun-decker Inspector at one Submarine Yard a couple of years got three years in prison and requirement to pay back a massive re-inspection expense.
|
||
Sewer Pipe Snipe
BBS Supporter Joined: 04 Jan 2016 Location: Albany, GA Status: Offline Points: 5723 |
Post Options
Thanks(0)
|
|
They were documented 40 years ago. Radiograph and inspected during construction. Each step signed off. Part of the sub-safe program. Wonder if it is the same problem they had with the certified bolts they bought that had the numbers, but none of the testing. I believe one or two engines fell off of planes because of them. They were apparently counterfeited in China that time. Elbows come in formed and documented and are apparently accepted on the basis of documentation. There will be a bunch of folks involved in this, both QA inspectors, weld inspectors and welders. Probably the company bosses also.
|
||
Walt,
Had I done everything right throughout my life, the World wouldn't have noticed. |
||
gerry
Admin Group Joined: 16 Dec 2015 Status: Offline Points: 635 |
Post Options
Thanks(0)
|
|
If it is permitted to answer, are MS piping welds not radiographed?
|
||
MT2/SS
USS Simon Bolivar - SSBN 641 (B) USS Henry M. Jackson - SSBN 730 (B) USSVI - Wyoming Base |
||
Dr. Stan
Rickover Joined: 04 Jan 2016 Location: Sevierville, TN Status: Offline Points: 7455 |
Post Options
Thanks(0)
|
|
Now, that is putting it mildly! If those elbows are where I am thinking they are in AMR2UL the failure of one of them would not be a mere nuisance it would be catastrophic. I don't think the AMR2UL watch would be able to reach the after tunnel door in time resulting in it being open allowing steam to vent into AMR1 and hence to the MC. Unless the Auxiliary man just happened to be standing in AMR1 close to the forward tunnel door, that is. But, chances are he might not be close enough to react quickly and then it would be very, very bad. Possibly as bad as the Thresher and Scorpion. I spent many hours as the AMR2UL watch and this scenario was one of my greatest fears. If someone sabotaged those welds purposely I think Homeland Security should get involved because that is an act of war or, at the very least, terrorism. But, if someone was just trying to get by with doing a sloppy job they still should be tracked down and brought to justice, as well. |
||
It has been my experience that folks who have no vices have very few virtues.~Abe Lincoln
SS-393, SSBN-610(B), SSBN-624(G), SSN-591 USSVI Life Member; Holland Club; Plank Owner, Smoky Mtn. Base |
||