"The opinions posted here do not represent those of any company, organization, or group and are those only of the author of the respective post." - From Rontini |
SSN Maintainence appears now on track |
Post Reply |
Author | |
Rontini599
Admin Group Joined: 23 Aug 2016 Location: Sheridan, WY Status: Offline Points: 704 |
Post Options
Thanks(0)
Posted: 27 May 2020 at 1:15pm |
After years of struggling to conduct attack submarine maintenance – with the four public naval shipyards prioritizing SSN work last, behind a backlog of ballistic-missile sub and aircraft carrier work, and private shipyards finding it tough to resume submarine repair work after years of only doing new construction – the Navy appears back on track for its SSN maintenance, the head of Naval Sea Systems Command told USNI News. The move of attack submarine USS Boise (SSN-764) to the dry dock at Newport News Shipbuilding in Virginia is the most visible sign of things moving in the right direction, after the sub has been sitting pier side at nearby Norfolk Naval Shipyard for more than four years waiting for maintenance to begin. The Navy had previously hoped to get Boise into Newport News as early as 2018, but the private yard struggled with its first two Los Angeles-class SSN maintenance periods – for USS Helena (SSN-725) and USS Columbus (SSN-762) – and didn’t have the room for the sub or the workforce to start working on it. As Boise lingered, it became a focal point in the discussion about a lack of repair capacity and a backup of work at the four public naval shipyards. |
|
My heroes wear dog tags, not shoulder pads
|
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |