Print Page | Close Window

SSN Maintainence appears now on track

Printed From: Rontini Submarine BBS
Category: General
Forum Name: U.S. Submarine Related
Forum Description: Submarine Related Topics
URL: http://RontiniSubmarineBBS.com/forum_posts.asp?TID=5547
Printed Date: 27 Apr 2024 at 10:28pm
Software Version: Web Wiz Forums 11.04 - http://www.webwizforums.com


Topic: SSN Maintainence appears now on track
Posted By: Rontini599
Subject: SSN Maintainence appears now on track
Date Posted: 27 May 2020 at 1:15pm

After years of struggling to conduct attack submarine maintenance – with the four public naval shipyards prioritizing SSN work last, behind a backlog of ballistic-missile sub and aircraft carrier work, and private shipyards finding it tough to resume submarine repair work after years of only doing new construction – the Navy appears back on track for its SSN maintenance, the head of Naval Sea Systems Command told USNI News.

The move of attack submarine USS Boise (SSN-764) to the dry dock at Newport News Shipbuilding in Virginia is the most visible sign of things moving in the right direction, after the sub has been sitting pier side at nearby Norfolk Naval Shipyard for more than four years waiting for maintenance to begin.

The Navy had previously hoped to get Boise into Newport News as early as 2018, but the private yard struggled with its first two Los Angeles-class SSN maintenance periods – for USS Helena (SSN-725) and USS Columbus (SSN-762) – and didn’t have the room for the sub or the workforce to start working on it. As Boise lingered, it became a focal point in the discussion about a lack of repair capacity and a backup of work at the four public naval shipyards.



-------------
My heroes wear dog tags, not shoulder pads



Print Page | Close Window

Forum Software by Web Wiz Forums® version 11.04 - http://www.webwizforums.com
Copyright ©2001-2015 Web Wiz Ltd. - http://www.webwiz.co.uk