Rontini Submarine BBS Homepage
Forum Home Forum Home > General > Navy News
  New Posts New Posts RSS Feed - Sub building problems
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

"The opinions posted here do not represent those of any company, organization, or group and are those only of the author of the respective post." - From Rontini

RontiniSubmarineBBS.com is proudly sponsored by SubmarineShop.com. Your patronage helps support this BBS.


Sub building problems

 Post Reply Post Reply
Author
Message
Sewer Pipe Snipe View Drop Down
BBS Supporter
BBS Supporter
Avatar

Joined: 04 Jan 2016
Location: Albany, GA
Status: Offline
Points: 5146
Post Options Post Options   Thanks (0) Thanks(0)   Quote Sewer Pipe Snipe Quote  Post ReplyReply Direct Link To This Post Topic: Sub building problems
    Posted: 15 Aug 2019 at 7:28pm
https://breakingdefense.com/2019/08/weld-problems-spread-to-second-navy-sub-program/

Columbia, Ohio Subs On Schedule, Despite Missile Tube Problems

The company that has experienced slip-ups in delivering missile tubes to the Navy might leave the business, leaving only a single company who can do the work.

By   PAUL MCLEARYon August 15, 2019 at 3:40 PM
Walt,
Had I done everything right throughout my life, the World wouldn't have noticed.
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.04
Copyright ©2001-2015 Web Wiz Ltd.

This page was generated in 1.328 seconds.